Guaranteeing Access to Excellence for All
Added new Physical Education Flex Space Classroom (2022)
Launched annual iKit Spring Break Job Shadowing Program (2022)
Funded iKit Summer Internships for recent graduates (2021-2022)
Funded Athletic Refreshment Stand & Storage Facility built by Geometry in Construction Students (2021)
Built All-Gender Locker Room (2021)
Created new ETHS Literacy Lab (2021)
Erected new 40′ Band Instruction Tower (2021)
Funded new Girls Locker Room (2021)
300 SLR Cameras donated to photography classes (2021)
Summer Band Camp funded (2021-2022)
Started a scholarship fund for private music lessons for band and orchestra students (2021-2022)
Provided industry quality Sound & Lighting Enhancements for ETHS Auditorium (2020)
New Electric Car building kit for Auto Tech Classes (2020)
Covid Student & Family Fund provided Hotspots, KitCare, Registration Fee Assistance, emergency needs (2020)
Updated chemistry classrooms with white boards and water distiller system (2020)
Funded Chromebooks and repair insurance for low income students (2020-2022)
Initiated a scholarship fund for endorsements for Lit Lab Reading Interventionists (2020-2022)
Launched Summer Lift Reading Program for K-12 Students to build literacy skills (2020-2022)
Provided funding for 3 Homes Built by Geometry in Construction Students (2019-2022)
Built the new Michael B. Arrington Wellness & Performance Center (2019)
Created New Upstairs Theatre Dressing Room & Costume Room (2019)
Re-Turfed Lazier Field (2019)
Remodeled Greenhouse and added Urban Agriculture classroom (2019)
Built covered Athletic Wing Community Atrium (2018)
Modernized Chem/Phys Labs and added ETHS Research Center (2018)
Built New Engineering Lab (2018)
Added Sound panels in 4 Music Rooms (2017)
Created new Ceramics Studio (2017)
Erected new Softball Grandstand (2017)
Provided a staff fellow for STEAM Capstone Class (2017-2022)
Reimagined Heritage Hall (2016)
Built permanent Construction site for Geometry in Construction (2015)
Added New Lake St. Tennis Courts (2015)
Created the Milligan Entrepreneurship Center (2015)
Redesigned the Leonard Schaeffer Theater, Planetarium (2014)
Created the Advanced Manufacturing & Welding Lab (2014)
Added 4 STEM Labs (2013)
Launched the Fodor Musician in Residency Program (2013-2022)
Connected the Wireless Campus (2012)
Hung new Theater Curtains in ETHS Auditorium (2011)
Equipped the REEL (Renewable Energy & Ecology) Lab (2011)
Furnished Transition House (special education life skills program (2011)
Built the Outdoor Student Commons & Bike Compound (2010)
Transformed the Automotive Technology Lab (2009)
Added Lights and Turf at Lazier Field (2008)