Guaranteeing Access to Excellence for All

IMPACT

IMPACT

IMPACT

IMPACT

Opening Doors for Students

Your gift creates limitless opportunities on every corner of the campus.

  • Created Alumni Hall, a tech-rich meeting and event hub (2024)
  • Built a new Health Science Center (2023)
  • Added new Physical Education Flex Space Classroom (2022)

  • Launched annual iKit Spring Break Job Shadowing Program (2022)

  • Funded iKit Summer Internships for recent graduates (2021-2022)

  • Funded Athletic Refreshment Stand & Storage Facility built by Geometry in Construction Students (2021)

  • Built All-Gender Locker Room (2021)

  • Created new ETHS Literacy Lab (2021)

  • Erected new 40′ Band Instruction Tower (2021)

  • Funded new Girls Locker Room (2021)

  • 300 SLR Cameras donated to photography classes (2021)

  • Summer Band Camp funded (2021-2022)

  • Started a scholarship fund for private music lessons for band and orchestra students (2021-2022)

  • Provided industry quality Sound & Lighting Enhancements for ETHS Auditorium (2020)

  • New Electric Car building kit for Auto Tech Classes (2020)

  • Covid Student & Family Fund provided Hotspots, KitCare, Registration Fee Assistance, emergency needs (2020)

  • Updated chemistry classrooms with white boards and water distiller system (2020)

  • Funded Chromebooks and repair insurance for low income students (2020-2022)

  • Initiated a scholarship fund for endorsements for Lit Lab Reading Interventionists (2020-2022)

  • Launched Summer Lift Reading Program for K-12 Students to build literacy skills (2020-2022)

  • Provided funding for 3 Homes Built by Geometry in Construction Students (2019-2022)

  • Built the new Michael B. Arrington Wellness & Performance Center (2019)

  • Created New Upstairs Theatre Dressing Room & Costume Room (2019)

  • Re-Turfed Lazier Field (2019)

  • Remodeled Greenhouse and added Urban Agriculture classroom (2019)

  • Built covered Athletic Wing Community Atrium (2018)

  • Modernized Chem/Phys Labs and added ETHS Research Center (2018)

  • Built New Engineering Lab (2018)

  • Added Sound panels in 4 Music Rooms (2017)

  • Created new Ceramics Studio (2017)

  • Erected new Softball Grandstand (2017)

  • Provided a staff fellow for STEAM Capstone Class (2017-2022)

  • Reimagined Heritage Hall (2016)

  • Built permanent Construction site for Geometry in Construction (2015)

  • Added New Lake St. Tennis Courts (2015)

  • Created the Milligan Entrepreneurship Center (2015)

  • Redesigned the Leonard Schaeffer Theater, Planetarium (2014)

  • Created the Advanced Manufacturing & Welding Lab (2014)

  • Added 4 STEM Labs (2013)

  • Launched the Fodor Musician in Residency Program (2013-2022)

  • Connected the Wireless Campus (2012)

  • Hung new Theater Curtains in ETHS Auditorium (2011) 

  • Equipped the REEL (Renewable Energy & Ecology) Lab (2011)

  • Furnished Transition House (special education life skills program (2011)

  • Built the Outdoor Student Commons & Bike Compound (2010) 

  • Transformed the Automotive Technology Lab (2009)

  • Added Lights and Turf at Lazier Field (2008)